Single-storey side return extension
£35,000–£60,0008–10 weeks, foundations, build, plastering, second-fix.
Extensions, loft conversions, refits — bigger projects need professional paperwork, not weekend admin. AllSquare lets you quote in detail, invoice on-site, and keep clients on the same page.

Last updated
Builders rarely send a single invoice for a job — they send several across the life of a project as work progresses. AllSquare is built for that rhythm. Build a detailed multi-line estimate at the start with labour and materials broken out, send it as a branded PDF, and convert it to the first invoice in one tap on sign-off. As the job progresses, build follow-up invoices that reference the work completed — labour days, plaster, second-fix, snagging — using your saved price list and voice-to-invoice when you’re short on time. Architects, surveyors and homeowners get a tidy paper trail and you stop doing maths in the kitchen.
Builders rarely send one invoice per job. AllSquare's saved client + invoice history is built around the multi-invoice rhythm of a build — deposit, mid-job, completion, snagging.
Single line item with the deposit amount. Locks the slot in your diary and pays for the first materials run.
Itemise what stage is complete — foundations, first-fix, plastering — using your saved labour rates. Send before the next stage starts.
Balance owed, with any agreed variations broken out as separate line items. PDF goes to the architect or QS as well as the homeowner.
Small final invoice once snags are closed and any retention period ends. Keeps the paper trail clean for the client and your books.
The features that matter most for builder invoicing.
Break down labour, materials and allowances on a detailed PDF estimate. Send and convert to invoice when signed off.
Common materials and your day rate, half-day rate and trade-specific labour rates saved once. Build invoices fast.
Describe the day’s work — “Two days plastering, 12 bags of multi-finish, half-day clean-up” — and AllSquare drafts the invoice.
No site Wi-Fi? Create invoices offline. They sync the moment you’re back on signal, no data lost.
UK pricing for common build types — use it as a sanity check, not gospel. Your real rates always win.
8–10 weeks, foundations, build, plastering, second-fix.
10–12 weeks, full structural plus en-suite.
3–5 days, structural calcs, building control.
4 weeks, foundations, build, electrics subcontract.
Multi-line estimates with labour, materials and contingencies broken out. Customers compare you on detail, not just price.
Build follow-up invoices using your saved rates and voice-to-invoice. No retyping the same scope across multiple bills.
Logo, address, contact details and itemised scope on every PDF. Looks like the kind of paperwork a surveyor expects to see.
A UK builder should invoice in agreed stages — a deposit, interim invoices as each stage is completed, and a final invoice — with each invoice showing the stage reached, any approved variations as separate lines, payments already received and the balance outstanding. Get the VAT rate, any CIS deductions and the payment terms right on every invoice, because on a build they add up to thousands of pounds. This guide covers the paperwork that keeps a project’s cash flow steady.
Every invoice needs your business name and address, the customer’s name and address, a unique invoice number, the date, a description of the work and the amount due. On a project that runs for weeks or months, each invoice also has to make sense against the original quote, so the customer, their architect or surveyor can see where the job is and what is left to pay.
| Field | Why it matters |
|---|---|
| Project name and site address | Ties every stage invoice to the same job, especially when the customer is billed somewhere else. |
| Estimate or contract reference | Links each invoice back to the agreed price and scope. |
| Stage being invoiced | “Stage 2: walls to wall plate, roof structure” — so the customer can check the work is done before paying. |
| Contract sum and amount previously invoiced | Shows the running position: total agreed, billed so far, this invoice, remaining. |
| Variations as separate, numbered lines | Each approved change — a moved doorway, upgraded windows — listed with its own price and reference. |
| Provisional sums and PC sums reconciled | Where the quote included allowances, show the actual cost against the allowance. |
| Retention (if agreed) | The percentage held back, the amount and when it falls due for release. |
| CIS deduction (if working for a contractor) | Labour and materials split so the contractor can calculate the deduction correctly. |
| VAT number, rate and amount, or reverse charge wording | The correct rate for the type of work, or reverse charge wording for CIS work between VAT-registered businesses. |
| Payment terms and due date | For each stage. Agreed in writing at the start. |
Stage payments should follow the build rather than the calendar for most domestic jobs. A typical extension might be invoiced as a deposit, then on completion of foundations and slab, walls to wall plate, roof on and watertight, first fix, plastering, and completion. Each stage should be one the customer can see and check. Avoid a large deposit that runs far ahead of the work — customers are increasingly wary of it, and it can be hard to justify if the job is delayed.
Agree the stages, the amounts and the payment terms on the estimate or contract before you start. When a stage is reached, invoice immediately: on a build, a week’s delay on each invoice can mean you are funding the job yourself for a month or more.
For commercial construction contracts, the Housing Grants, Construction and Regeneration Act 1996 (the Construction Act) generally gives a right to interim payments on longer jobs, sets rules on payment and pay-less notices, and gives a right to suspend work for non-payment. It does not generally apply to contracts with a homeowner for work on their own home, so for domestic jobs your written terms are what count.
Most disputes on building jobs are about variations. The fix is simple to describe and easy to skip when busy: put every change in writing with a price before you do it, give it a number, and list it on the next invoice as its own line. A short text or email — “Variation 3: move kitchen doorway 600mm left, £480 plus VAT, OK to proceed?” — with the customer’s reply is enough to show it was agreed.
Provisional sums (allowances for work you cannot price yet, such as ground conditions) and PC sums (allowances for items the customer will choose, such as a kitchen or sanitaryware) need reconciling as the job goes on. Show the allowance and the actual cost on the invoice, so the customer sees exactly why the total moved.
Dayworks — extra labour and materials charged at agreed rates rather than a fixed price — should be backed by a record of hours and materials. A simple timesheet signed or acknowledged by the customer at the end of each day saves a long argument at the end of the job.
You must register for VAT once your taxable turnover passes £90,000 in a rolling 12 months. On a large job, a single contract can take you over the threshold, so keep an eye on your rolling total rather than waiting for your year end.
Most work on existing homes — extensions, loft conversions, refurbishments — is standard-rated at 20%. Some building work has a different rate: building a new dwelling is generally zero-rated, and some conversions (for example turning a non-residential building into homes, or changing the number of dwellings in a building) and renovating homes that have been empty for at least two years can qualify for the 5% reduced rate. The conditions are detailed and need evidence, so check HMRC’s VAT Notice 708 or speak to an accountant before you invoice at anything other than 20%.
If you are VAT-registered and subcontracting for a VAT-registered contractor under CIS, the domestic reverse charge usually applies: your invoice shows the VAT rate and amount but states that the customer accounts for the VAT to HMRC. When you are the main contractor working directly for a homeowner, you charge VAT normally.
As a subcontractor, a contractor deducts CIS from the labour part of your invoices: 20% if you are registered with HMRC, 30% if not, and nothing if you hold gross payment status. Deductions do not apply to materials, so split labour and materials clearly on every invoice. Keep the monthly payment and deduction statements — the deductions are credited against your tax and National Insurance.
If you pay other trades to work on your jobs, you may be a contractor under CIS yourself. Contractors must register, verify each subcontractor with HMRC, make the right deductions, pay them over to HMRC and file monthly returns. This applies to work you subcontract out on construction contracts; homeowners paying you for work on their own home are not contractors for CIS. AllSquare does not calculate CIS — record any deduction in the invoice notes and keep your figures with your accountant or payroll software.
Short payment terms on domestic stage invoices — 3 to 7 days — keep the job funded. Make it clear in writing that work on the next stage starts once the previous invoice is paid. If the customer agreed the job in their home, consumer cancellation rules usually give them 14 days to cancel; if they want you to start within that time, get the request in writing.
For business customers, the Late Payment of Commercial Debts (Interest) Act lets you claim statutory interest at 8% above the Bank of England base rate on overdue invoices, plus fixed compensation of £40, £70 or £100 depending on the invoice amount. It does not apply to homeowners and other consumers; you can only charge them interest if it was clearly agreed in your terms before the work started.
Making Tax Digital for Income Tax has applied since 6 April 2026 to sole traders with qualifying income over £50,000, and is due to extend to over £30,000 from April 2027 and over £20,000 from April 2028. Because it is based on turnover, most full-time builders will be in scope soon if they are not already. AllSquare does not file with HMRC, but keeps every stage invoice numbered and itemised for your records. Check gov.uk for your position.
Common questions from builders using AllSquare.
Yes — most builders do. Save the client once, then build each invoice (deposit, mid-job, completion) with line items describing what stage was completed. The client record keeps a full history of what’s been billed.
Start free, upgrade when you need. No hidden fees, cancel anytime.
Everything you need to get started
Free forever
Full access, cancel anytime
Unlimited invoices, estimates & AI
Multiple live jobs at once — keep each customer’s invoices and quotes tidy.
Inspections, slipped tiles and full re-roofs — invoiced cleanly with branded PDFs.
Per-room pricing and same-day invoices when the brushes are down.
Speak the job into an invoice from the van. Works offline, with a saved price list for parts and rates.
Builders use AllSquare to send detailed quotes, invoice on-site and keep clients on the same page.