Slipped-tile callout
£120–£2201–2 hours, ladder access, single tile replaced.
Roof inspections, slipped tiles, full re-roofs and insurance work — AllSquare turns each into a polished invoice with materials and labour itemised.

Roofing work has a shape that spreadsheets don't love — small emergency patches, insured storm-damage claims, and multi-day re-roofs. Each needs a different billing cadence.
Callout + materials + labour on a single-line invoice sent the same day. Save the common emergency rates to your price list once.
Itemised estimate with photos of the damage described in notes — AllSquare lets you build a detailed quote that insurers accept without going back and forth.
Three or four invoices across the job: deposit (scaffold + materials), interim (strip and felt), completion (balance). All linked to the same client.
Last updated
Roofing is unusual: insurance work needs paperwork that loss adjusters will accept, full re-roofs are six-figure builds, and a single slipped-tile callout is a £150 job that needs to bill itself on the kerb. AllSquare flexes across all three. Save your common materials and labour rates to your price list, build multi-line estimates for bigger jobs, and voice-to-invoice on the kerb after smaller callouts — “Slipped tile, ladder access, hour and a half, one tile” and the PDF is ready in 30 seconds. Branded with your logo and business details, the paperwork looks the part for insurers, homeowners and main contractors alike.
The features that matter most for roofer invoicing.
Detailed PDF quotes with materials, labour and access broken out. Convert to invoice in one tap on sign-off.
Describe the work done — “Chimney repoint, two days, scaffolding, ten kg lead, mortar” — and AllSquare drafts the invoice.
Common materials (tiles, slate, ridge tiles, lead, felt, battens) and your day rate saved once. Add with a tap.
Logo, business details and clean layout. Looks like the paperwork insurers and homeowners expect.
Indicative UK ranges — from a slipped tile to a full re-roof. Yours take precedence once saved.
1–2 hours, ladder access, single tile replaced.
1–2 days, scaffolding, lead, mortar.
Itemised scope, scaffolding.
5–8 days, scaffold, batten, felt, tiles, ridge.
Itemise scope and materials clearly on a branded PDF. Most insurers accept the format first time.
Add scaffolding as its own line item so customers see the cost of access. Bigger jobs close faster.
Slipped-tile callout? Voice the job into a PDF before you’ve climbed back into the van.
A UK roofer should invoice with access (scaffolding or ladder work), materials, labour and waste disposal on separate lines, a clear description of the area of roof worked on, and any guarantee terms in writing. Small repairs suit a single invoice on completion; re-roofs need an estimate, a deposit and stage invoices; insurance work needs the claim reference and a clear answer to who is paying. Here is how to set each up so you get paid in full.
Every invoice needs your business name and address, the customer’s details, a unique invoice number, the date, a description of the work and the amount due. Roofing invoices also need to describe work the customer usually cannot see — they are not going up a ladder to check your lead flashing — so the detail is what makes the bill credible.
| Field | Why it matters |
|---|---|
| Property address and roof area | “Rear pitch, above kitchen extension” tells the customer and any insurer exactly where you worked. |
| Scaffolding or access equipment as its own line | Often the biggest single cost on a small job. Itemising it shows the customer they are paying for safe access, not inflated labour. |
| Materials itemised | Tiles or slates, membrane, battens, lead, ridge and verge, mortar or dry-fix systems. Makes quantities easy to check against the estimate. |
| Labour (days or fixed price) | Matches how you quoted. Show days on site for larger jobs. |
| Waste removal and skip hire | Old tiles, felt and battens have to go somewhere. Bill it separately rather than burying it in labour. |
| Guarantee or warranty terms | State what is covered, for how long and any conditions. Vague promises cause disputes years later. |
| Insurance claim reference (insurance work) | Insurers and loss adjusters match invoices to claims by reference. Without it, payment stalls. |
| Building regulations or scheme reference (where applicable) | Some larger re-roofing work is notifiable. If you are in a competent person scheme for roofing, record the reference. |
| VAT details (if registered) | Your VAT number, rate and VAT amount. |
| Payment terms and bank details | Including how any deposit already paid has been deducted. |
Most roofers subcontract scaffolding. You can either pass it through at cost, add a handling margin, or include it in a supply-and-erect price — all are fine, as long as the estimate and invoice agree. Many roofers find it simplest to show scaffolding as one line with a fixed hire period, and to say in the estimate what happens if the job overruns because of weather. If the scaffold needs a licence to go on the pavement or road, the cost of that licence should be priced in too; your scaffolder or the local council can tell you what applies.
Weather is the variable roofers cannot control, so fixed prices for defined jobs work better than open-ended day rates for most domestic customers. Where you do use day rates, explain on the estimate that you only charge for days you are working on the roof, and record those days on the invoice.
Materials should be priced at what you sell them for, not what you paid. A reasonable markup covers ordering, collection, storage and waste allowance. Show quantities — “Concrete interlocking tiles, 40” — so the customer can see the job was sized properly.
For a full re-roof, a common structure is a deposit on acceptance (covering scaffolding and materials), an interim invoice once the old covering is stripped and the new membrane and battens are on, and a final invoice on completion once the scaffold is down and the site is clear. Agree these stages on the estimate so each invoice is expected.
Hidden problems are routine in roofing — rotten rafters, failed sarking boards, a chimney that needs more than a repoint. Agree a price for any extra work before you do it, even if it is just a text message with a photo and a number, and add it to the next invoice as a named variation. Customers rarely argue with an extra they approved in writing.
If the customer agreed the job at their home, consumer cancellation rules usually give them 14 days to change their mind. If they want you to start within that window, get their request in writing. Emergency repairs they specifically called you out for are generally treated differently — check gov.uk or Citizens Advice business guidance if you are unsure.
Insurance jobs start with a detailed estimate, because the insurer or loss adjuster will compare it against the damage. Describe the cause, the area affected and the work needed, and itemise access, materials and labour. Keep your photos and refer to them in the notes.
Before you start, agree in writing who you are invoicing. Sometimes the insurer pays you directly; often the policyholder pays you and claims it back, or the insurer pays them. The homeowner usually pays any policy excess. Put the claim reference on every estimate and invoice, and address the invoice to whoever has agreed to pay it. Chasing an insurer for a bill addressed to the homeowner wastes weeks.
You must register for VAT once your taxable turnover passes £90,000 in a rolling 12 months; after that, most roofing work is standard-rated at 20%. Roof insulation in homes is one of the energy-saving materials that has had a VAT relief, so if you install loft or roof insulation as part of a job, check HMRC’s VAT Notice 708/6 or ask your accountant how to treat that part.
Roofing is construction work under CIS. If you work for a builder or main contractor, they deduct 20% from the labour part of your invoice if you are CIS-registered, 30% if you are not, and nothing with gross payment status. Deductions do not apply to materials, so keep labour and materials on separate lines, and check with the contractor how they will treat any scaffolding you have subcontracted. If you are VAT-registered and the contractor is too, the domestic reverse charge usually applies: your invoice shows the VAT but says the contractor accounts for it to HMRC. None of this applies to homeowners.
For small domestic repairs, ask for payment on completion and send the invoice before you leave. For re-roofs, stage payments mean you are never too far out of pocket. Do not let the scaffold come down with a large balance unpaid if you can avoid it — agree on the estimate that the final payment is due on completion, before or as the scaffold is struck.
For business customers — contractors, managing agents, commercial landlords — you can claim statutory interest under the Late Payment of Commercial Debts (Interest) Act at 8% above the Bank of England base rate, plus fixed compensation of £40, £70 or £100 depending on the invoice size. It does not apply to homeowners and other consumers; you can only charge them interest if it was clearly agreed in your terms first.
Making Tax Digital for Income Tax has applied since 6 April 2026 to sole traders with qualifying income over £50,000, and is due to extend to over £30,000 from April 2027 and over £20,000 from April 2028. Because it is based on turnover, a few re-roofs a year can take you over. AllSquare does not file with HMRC, but keeps your invoices in order for whichever compatible software you use. Check gov.uk for your position.
Common questions from roofers using AllSquare.
AllSquare’s PDF format is clean, branded and itemised — most insurers accept this format first time. The notes field on every invoice is free-text so you can include the claim reference and scope summary.
Start free, upgrade when you need. No hidden fees, cancel anytime.
Everything you need to get started
Free forever
Full access, cancel anytime
Unlimited invoices, estimates & AI
Multi-line quotes for extensions, conversions and refits. Branded PDFs, voice-built invoices.
Multiple live jobs at once — keep each customer’s invoices and quotes tidy.
Per-room pricing and same-day invoices when the brushes are down.
Small jobs add up — speak the invoice in 30 seconds, before you leave the driveway.
Roofers use AllSquare for insurance work, full re-roofs and one-off callouts — billed cleanly from the kerb.