Patio installation (sandstone, 25 sqm)
£3,500–£5,5005–7 days, materials, base prep, jointing.
Patios, decking, full garden redesigns and turf-laying — projects that run for weeks need professional quotes and progress invoices, not one big bill at the end.

Last updated
A landscaping project is closer to a small build than a one-off gardener visit: multi-week timelines, hefty material spend up front, and a customer who needs to see what they’re paying for. AllSquare lets you quote the full job with a detailed line-by-line breakdown (sleepers, paving, turf, plants, aggregate), then convert the estimate to an invoice in one tap on sign-off. As the project progresses, build follow-up invoices that reference the work completed using your saved price list and voice-to-invoice. The result is fewer arguments at handover, faster sign-off on bigger jobs, and a clean paper trail.
A landscaper's year moves between planting plans, big installs and ongoing maintenance rounds. Each shape has a different billing cadence, and AllSquare lets you run all three without flipping between tools.
Fixed-fee for a plan, often £500–£1,500 depending on scope. One invoice on delivery, with the drawings referenced in the notes.
Multi-stage billing for the construction: ground works, paving, planting, finish. Deposit covers materials; interim covers the hard-landscaping phase; completion handles planting and snagging.
Fortnightly or monthly visits per client. Save the visit as a price list item and bill in 10 seconds per customer.
Separate end-of-season invoice for leaf clearance, winter prep and borderline-materials work. Different line items from the maintenance baseline.
The features that matter most for landscaper invoicing.
Detailed PDF estimates with materials and labour broken out. Send and convert to invoice when signed off.
Common materials and your day rate saved once. Build accurate invoices fast without re-pricing every job.
Describe the day’s work — “Two days laying patio, 25 sqm sandstone, half-day for jointing” — and the AI drafts the invoice.
Logo, business details and clean layout on every quote and invoice. Looks like a professional landscape business.
Sleepers, paving, turf, plants — itemise the materials and labour in the estimate so the customer sees value, not just a total.
Bill in stages by sending separate invoices for deposit, mid-project work, and completion. Each linked to the same client.
Customer added a pergola or upgraded paving? Voice the variation into a follow-up invoice line in 30 seconds.
UK ranges for garden design, build and maintenance work. Your saved rates always take priority.
5–7 days, materials, base prep, jointing.
2–3 days, prep, turf, edging.
4–5 days, materials at trade, frame and boards.
4–8 weeks, design fee + build, plants, lighting.
A UK landscaper should invoice larger projects in stages — a deposit before materials are ordered, interim invoices as each phase is finished, and a final invoice on completion — with every invoice referring back to the accepted quote. Each one needs a unique number, your business details, the customer and site address, what’s being billed in that stage, any agreed variations, and the balance still to pay. Add VAT only if you’re VAT-registered, and check whether the Construction Industry Scheme applies if you’re working for another contractor rather than a homeowner.
On a multi-week build the invoice has to do more work than on a one-day job: it needs to show where the customer is in the project, not just what they owe today.
| Field | Why it matters |
|---|---|
| Unique invoice number and date | Required on every invoice. Use one running sequence across all projects. |
| Quote or estimate reference | Ties every stage invoice to the price the customer accepted, so there’s no debate about what was agreed. |
| Site address | Often different from the billing address on new-build or rental properties. Essential if you’re working for a developer or main contractor. |
| Stage being billed | E.g. “Stage 2 of 4: groundworks and sub-base complete”. Customers pay faster when they can see the milestone has been reached. |
| Materials and labour shown separately | Paving, sleepers, aggregate, turf and plants on their own lines. Essential under CIS, where deductions apply to labour only. |
| Plant and skip hire | Mini-digger, wacker plate or skip hire as distinct lines, so the customer sees the real cost of groundworks. |
| Variations | Each agreed change (extra steps, upgraded paving, added lighting) as its own line with a short description and the date it was agreed. |
| Deposit and previous payments | Show what’s already been paid and the balance outstanding. Avoids the classic final-invoice dispute. |
| Waste carrier registration number | If you remove spoil or green waste yourself, add your registration number in the invoice notes. |
| Plant guarantee or aftercare terms | If you offer a replacement guarantee on plants or turf conditional on watering, a one-line note avoids arguments in a dry summer. |
Landscaping is materials-heavy. On a patio in the £3,500–£5,500 range, a large share of the cost can be stone, sand and cement bought before you lift a shovel, so cash flow depends on getting money in ahead of the spend. A common structure is:
Variations are where landscaping profit leaks away. A customer who asks for a wider path or a step in the lawn is asking for extra labour and materials, and the time to price it is before you do it. Write the change down, give a price, get a yes in writing (a text or email is fine), then add it to the next invoice as a separate line. Don’t quietly absorb it into the stage total.
For materials, decide whether you’re charging at cost plus a markup or including them in a fixed price, and be consistent. If you pass on a material price rise mid-project, only do it where your quote allowed for it — otherwise the accepted price stands. Price-sensitive items such as natural stone are worth quoting with a validity period (for example 30 days) so an old quote isn’t accepted months later at yesterday’s prices.
VAT: you must register once your taxable turnover passes £90,000 in a rolling 12-month period (the threshold since 1 April 2024). With full garden redesigns in the £12,000–£28,000 range, a landscaping business can reach that much faster than a maintenance gardener, so check your rolling total every month. Once registered, landscaping is standard-rated at 20%. Below the threshold, don’t charge VAT and don’t show a VAT line.
CIS: the Construction Industry Scheme doesn’t apply to work you do directly for a homeowner, or to routine garden maintenance. But hard landscaping and groundworks done as a subcontractor for a builder or developer on a construction project can fall within CIS. In that case the contractor deducts 20% from the labour part of your invoice if you’re registered for CIS, 30% if you’re not, or nothing if you have gross payment status. Deductions are taken from labour, not materials, which is why the split on your invoice matters. If you’re unsure whether a contract is in scope, ask the contractor and check HMRC’s CIS guidance.
Domestic reverse charge: this only applies when you’re VAT-registered, you’re supplying another VAT-registered business, and the work falls within CIS — and the customer isn’t the end user. In that case you don’t charge VAT on the invoice; instead you add a note that the reverse charge applies and the customer accounts for the VAT to HMRC. It never applies to homeowner jobs.
Put the payment schedule in the quote, not just on the invoices, so the customer knows from day one that a stage invoice will arrive when the base is down. Short terms suit domestic stage payments — payment within 7 days, or before the next phase starts. Don’t start a new phase with the previous invoice unpaid unless you’re comfortable carrying that risk.
For business customers — developers, housebuilders, management companies or main contractors — the Late Payment of Commercial Debts (Interest) Act lets you claim statutory interest at 8% above the Bank of England base rate, plus fixed compensation of £40, £70 or £100 depending on the size of the invoice. It doesn’t apply to homeowners, so for domestic work your protection is a clear payment schedule and stopping work if stage payments aren’t made.
If your qualifying income is over £50,000, Making Tax Digital for Income Tax has applied to sole traders since 6 April 2026, with the threshold dropping to £30,000 from April 2027 and £20,000 from April 2028 — check gov.uk for your position. AllSquare doesn’t file MTD returns, but keeping every quote and invoice in one place makes the records simpler to hand over.
Common questions from landscapers using AllSquare.
Yes. Send a deposit invoice with a single line for the deposit amount when the customer accepts. Send a follow-up invoice for the actual work as it progresses. Both linked to the same client.
Start free, upgrade when you need. No hidden fees, cancel anytime.
Everything you need to get started
Free forever
Full access, cancel anytime
Unlimited invoices, estimates & AI
Recurring rounds and one-off tidies — voice an invoice between visits.
Multi-line quotes for extensions, conversions and refits. Branded PDFs, voice-built invoices.
Multiple live jobs at once — keep each customer’s invoices and quotes tidy.
Per-room pricing and same-day invoices when the brushes are down.
Landscapers use AllSquare for detailed quotes, progress invoices and clean handovers.