Kitchen refit (full, mid-spec)
£12,000–£22,0004–6 weeks, units, worktop, flooring, splashback, plumbing/electrics subbed.
Three jobs running, two clients to keep happy — AllSquare keeps each customer’s estimates and invoices in one place without spreadsheets or end-of-week panic.
CIS
Deductions noted on invoices
B2B+B2C
Both billing modes
20%+5%
Standard & reduced VAT

Last updated
General builders rarely run one job at a time. There’s the loft conversion, the kitchen extension, and the bit of subbie work for a main contractor. Each has its own client, its own scope, its own invoices — and forgetting which is which is how money slips. AllSquare keeps each customer’s estimates and invoices linked together, so the loft client sees only their own invoices, the kitchen extension stays separate, and you can build follow-up invoices on-site using voice-to-invoice and your saved price list. The year-end picture stays cleaner than it ever has, and the accountant calls in March become a 20-minute job.
General builders switch between retail (homeowner) and trade (main contractor) jobs — each has its own tax rules, payment terms and expected invoice format. AllSquare handles both without a separate setup.
Standard VAT, informal payment terms, invoice goes direct to the household email. Branded PDF with your trade name.
CIS deductions in the notes (gross or net), 30-day payment terms, invoice goes to the contractor's accounts email with the PO reference on every line.
Save both types of client. Build the invoice from the right template; AllSquare keeps the paper trail clean for your end-of-year accounts.
The features that matter most for general builder invoicing.
Each customer saved once with their billing details. All their estimates and invoices live under their record.
Detailed quotes with labour, materials and allowances broken out. Convert to invoice in one tap on sign-off.
Describe the day’s work and the AI drafts the invoice with itemised labour and materials.
Create invoices on-site with no signal. Everything syncs when you reconnect.
Indicative UK ranges for mixed-trade work. Your rates take priority in the calculator.
4–6 weeks, units, worktop, flooring, splashback, plumbing/electrics subbed.
6–8 weeks, structural, insulation, second-fix.
5–7 days, structural calcs, BC sign-off.
Variable per stage and main-contractor.
Estimates and invoices for each client live under their record. No mixing up clients on the wrong invoice, no Friday-night reconciliations.
After a long day, tap the mic and describe what got done. AllSquare drafts the invoice; you review and send.
Logo, business details and clean layout. Customers and accountants take you seriously from the first invoice.
A UK general builder should invoice in stages that match the payment schedule in the accepted quote — deposit, interim stages and completion — with variations itemised separately and every invoice showing the running total paid and owed. Homeowner work is invoiced with standard VAT if you’re registered and no CIS. Work for a main contractor is usually under the Construction Industry Scheme, with labour and materials split out and, if you’re both VAT-registered, the domestic reverse charge instead of VAT.
On a project worth tens of thousands, the invoice is part of the contract paper trail. These fields keep each stage invoice clear on its own and easy to reconcile against the whole job.
| Field | Why it matters |
|---|---|
| Unique invoice number and date | Required on every invoice. One sequence across every job you run. |
| Site address and job name | Separates the loft conversion from the kitchen extension in both your records and the client’s. |
| Quote, contract or PO reference | Ties each invoice to the agreed price. Main contractors often reject invoices without their PO or order number. |
| Stage or valuation being billed | E.g. “Stage 3: first fix complete” or “Valuation 4 to 31 October”. Shows the client exactly which milestone is being paid for. |
| Labour and materials split | Required in practice under CIS, because the contractor’s deduction applies to labour only. Useful on homeowner jobs too. |
| Variations | Each instructed change with a short description, date instructed and price. Never merge them into the stage figure. |
| Provisional sums adjusted | If your quote included a provisional sum (for example for groundworks of unknown depth), show the actual cost against the allowance. |
| Retention held | Where a contractor holds retention, show the gross amount, the retention deducted and the net due, so the retention you’re owed is on record. |
| CIS details | For contractor work: your UTR and, if you show it, the expected CIS deduction and net payable. |
| VAT or reverse charge wording | Standard VAT for homeowners if registered; reverse charge wording where it applies. Don’t show VAT at all if you’re not registered. |
| Paid to date and balance | Contract sum, variations, amounts invoiced and paid so far, and what’s left. Prevents surprise at the final account. |
Agree the payment schedule before you start and write it into the quote. On a kitchen refit in the £12,000–£22,000 range or a garage conversion at £18,000–£32,000, you don’t want to be carrying weeks of labour and materials unpaid. Tie each stage to something visible — foundations in, watertight, first fix, plastered, completion — rather than to dates, so payment follows progress.
Variations need the same discipline. When a client asks for an extra socket run, a different floor finish or a moved doorway, confirm the change and the price in writing before you do it, then bill it as a separate line on the next stage invoice. A running list of variations makes the final account straightforward instead of a negotiation.
Retention is common on commercial and subcontract work: the contractor holds back a percentage of each payment — often in the region of 3–5% — and releases it at practical completion and after the defects period. Keep your own record of every retention amount, because it’s easy for small sums held over a year to be forgotten. Homeowners rarely hold formal retention, but some will hold back a final payment until snagging is done; agree that up front.
For contractor work, the Housing Grants, Construction and Regeneration Act (the “Construction Act”) broadly gives you a right to interim payments on longer contracts, requires the paying party to issue payment notices, and makes most “pay when paid” clauses ineffective. It doesn’t apply to contracts with residential occupiers for work on their own home, so homeowner jobs rely on the payment terms in your quote.
When you work for a main contractor on construction work, the contractor must verify you with HMRC and deduct tax from the labour part of each payment: 20% if you’re registered for CIS, 30% if you’re not, or nothing if you have gross payment status. Materials you supply, plant hire you’ve paid for, and VAT are not subject to the deduction.
That’s why your invoice must split labour and materials clearly. If the whole figure is shown as one line, the contractor may deduct on the full amount, and you’re left reclaiming the overpayment through your tax return. Many subcontractors also show the expected CIS deduction and the net amount, which helps reconcile against the monthly payment and deduction statement the contractor must give you. Keep those statements — you’ll need them to claim credit for the tax already deducted.
CIS doesn’t apply to work you do directly for a homeowner. If you hire your own subcontractors on a job, you may be a contractor under CIS yourself, with obligations to verify them, deduct and file monthly returns — check HMRC’s CIS guidance if that applies to you.
You must register for VAT once your taxable turnover passes £90,000 in a rolling 12-month period (the threshold since 1 April 2024). At general builder project values, a handful of jobs can take you over, so check the rolling total monthly. Most building work on existing homes is standard-rated at 20%.
Some work qualifies for lower rates — the construction of new dwellings can be zero-rated, and certain residential conversions and renovations of homes that have been empty for at least two years can qualify for 5%. The conditions are strict and the evidence matters, so check HMRC’s guidance on buildings and construction (VAT Notice 708) or ask your accountant before invoicing at anything other than 20%.
The domestic reverse charge applies only when you’re VAT-registered, supplying a VAT-registered contractor, the work is within CIS, and the contractor isn’t the end user. You don’t charge VAT; instead the invoice states that the reverse charge applies and the customer must account for the VAT to HMRC. It never applies to homeowner invoices, and it doesn’t apply if you’re not VAT-registered.
Homeowner stage invoices work best with short terms — 7 days, or before the next stage starts — and a clear understanding that work pauses if a stage isn’t paid. Contractors typically work to 30-day terms or their own payment cycle; find out their application and payment dates before the first invoice so yours lands in the right run.
For business customers only, the Late Payment of Commercial Debts (Interest) Act allows statutory interest at 8% above the Bank of England base rate plus fixed compensation of £40, £70 or £100 depending on the invoice size. It doesn’t apply to homeowners.
Making Tax Digital for Income Tax requires sole traders with qualifying income over £50,000 to keep digital records and send quarterly updates from 6 April 2026, with the threshold falling to £30,000 from April 2027 and £20,000 from April 2028. Check gov.uk for your position. AllSquare isn’t MTD or CIS filing software, but keeping each client’s estimates and invoices together makes the figures far easier to hand over to your accountant.
Common questions from general builders using AllSquare.
Yes. Save each customer once; their estimates and invoices live under their record. Pulling up the loft client’s history vs. the kitchen extension client’s history is a couple of taps each.
Start free, upgrade when you need. No hidden fees, cancel anytime.
Everything you need to get started
Free forever
Full access, cancel anytime
Unlimited invoices, estimates & AI
Multi-line quotes for extensions, conversions and refits. Branded PDFs, voice-built invoices.
Inspections, slipped tiles and full re-roofs — invoiced cleanly with branded PDFs.
Per-room pricing and same-day invoices when the brushes are down.
Speak the job into an invoice from the van. Works offline, with a saved price list for parts and rates.
General builders use AllSquare to keep multi-job invoicing tidy without spreadsheets.