Invoice app for electricians Get paid faster as an electrician

Finish the job, send the invoice — before you’ve packed up the van. Describe the work by voice and AllSquare turns it into a professional invoice in seconds.

30s

Voice-to-invoice in the van

100%

Works offline in lofts

EICR

Codes on every PDF

AllSquare invoice app for electricians

Last updated

Electricians don’t sit at a desk. You’re in lofts, under floorboards, in commercial cupboards with no signal — and the last thing you want at the end of a 12-hour day is to type up invoices on a laptop. AllSquare is built for the way electricians actually work: speak or type a description of the job and the AI turns it into a professional invoice in seconds. Save your common items — RCBOs, fuse boards, hourly rate, callout fee — to your price list and add them with a tap. The app works fully offline and syncs to the cloud when you reconnect, so a basement with no signal isn’t a blocker.

What the AllSquare electrician app does

The features sparkies actually open the app for.

  1. 01

    Voice-to-invoice

    Describe the job — parts, labour, callout — and the AI fills in the line items, totals and tax. Faster than tapping fields on a phone.

  2. 02

    Saved price list

    Store your most-used parts and rates (RCBOs, sockets, hourly, callout) and add them to invoices in a tap.

  3. 03

    Works offline

    Create invoices in lofts, basements or new-builds with no signal. Everything syncs to the cloud when you reconnect.

  4. 04

    Estimate to invoice

    Send a branded PDF estimate; convert it to a full invoice in a single tap when the customer signs off.

Built for the certs and codes you actually use

From periodic inspection observations to Part-P notification numbers, AllSquare's free-text fields and price list slots are designed for the way electricians document jobs — not for a generic accountancy product.

  • EICR observation codes (C1, C2, C3, FI) in the notes field
  • Part-P notification number on the PDF
  • Building control reference per job
  • Periodic inspection certificate references
  • Callout fee, hourly and emergency rates saved
  • RCBOs, sockets and consumer units in the price list

Three things sparkies tell us about AllSquare

⚡

Invoice without leaving the van

Describe the job by voice — “EICR on a 3-bed, two C2 observations, two hours” — and AllSquare drafts the invoice. Review, tweak, send.

📋

Estimates that win the job

Send a polished PDF estimate from the kitchen of every quote visit. Convert to invoice in one tap when the work’s signed off.

🧾

No more Friday-night paperwork

The dashboard surfaces overdue invoices at a glance, so chasing payment becomes a five-minute job, not an evening.

Common electrical jobs and pricing

Indicative UK rates for typical electrician work. Yours, once saved to the price list, take priority.

  • Single double-socket replacement

    £60–£90

    Standard swap, 1 hour labour, parts at trade.

  • EICR — 3-bed domestic

    £180–£280

    Full periodic inspection, certificate, minor remedials.

  • Consumer unit upgrade

    £450–£750

    RCBO board, certificates, half-day labour, CU disposal.

  • Full house rewire

    £3,500–£6,500

    8–10 day job, materials, certs, plastering allowance.

The UK electrician's invoicing guide

A UK electrician should invoice each job with labour, materials and any callout fee on separate lines, plus the certificate that covers the work — an Electrical Installation Certificate, Minor Works Certificate or EICR — and, for notifiable domestic work, the Part P notification or building control reference. Send it the day the job is finished, with clear payment terms, and keep VAT, CIS and landlord paperwork in step with what the customer actually needs. This guide covers what goes on the invoice, how to price it, and the tax rules that catch sparkies out.

What to put on an electrician invoice

Every UK invoice needs the basics: your name or business name, address and contact details, the customer’s name and address, a unique invoice number, the invoice date, a description of the work and the amount due. On top of that, electrical work has its own paper trail, and putting the references on the invoice ties the bill to the certificate. If a homeowner, landlord, letting agent or building control officer asks later, one document answers the question.

FieldWhy it matters
Invoice number and dateRequired on every invoice. Use a sequence you never reuse — it is how you and your accountant match payments.
Site address (if different from billing address)Landlords and agents pay for several properties. The installation address tells them which one this bill is for.
Callout fee, labour and materials as separate linesCustomers query lump sums. Separate lines also matter for CIS, where deductions come off labour only.
Certificate type and number (EIC, Minor Works or EICR)Links the invoice to the BS 7671 certificate you issued, so the customer can find both when they sell, let or insure the property.
Part P notification or building control referenceFor notifiable work in England and Wales (a new circuit or consumer unit change, for example) the customer should get a Building Regulations compliance certificate. Quoting the notification reference shows the job was registered.
Competent person scheme membershipNICEIC, NAPIT and similar schemes are what let you self-certify notifiable work. Adding your membership number reassures customers checking you out.
EICR result and observation codes (landlord work)Summarise the outcome (satisfactory or unsatisfactory) and any C1, C2 or FI items, and whether remedials are quoted separately.
VAT number, rate and VAT amountOnly if you are VAT-registered. Show the rate and VAT total for each rate used.
Payment terms and bank detailsState the due date and how to pay. “Due on completion” or 7 days is common for domestic work.

How to price electrical work on an invoice

Most domestic electrical work is billed one of three ways: a fixed price agreed up front (consumer unit upgrades, EICRs, rewires), labour by the hour plus parts (fault-finding, small additions), or a callout fee plus time on site (emergencies). Whichever you use, the invoice should match the way you quoted it. If you quoted a fixed price, invoice the fixed price and add agreed extras as separate lines underneath — not a new total with no explanation.

Fault-finding is where electricians lose the most money. You can spend two hours tracing an intermittent RCD trip and only replace a £6 accessory. Quote fault-finding by the hour from the start, say so on the estimate, and itemise the time on the invoice so the customer sees what they are paying for. A line such as “Fault-finding: intermittent RCD trip on kitchen circuit, 2 hrs” is much harder to argue with than “Labour £130”.

For materials, decide whether you show your trade price, a marked-up price, or just a supply-and-fit price per item. All three are legitimate, but be consistent. Many electricians price common items (an RCBO, a double socket, a downlight) as a supplied-and-fitted unit and only itemise unusual parts. Saving those unit prices to your price list keeps every invoice consistent.

On bigger jobs such as a full rewire, take a deposit to cover materials and agree stage payments — for example after first fix and on completion with certificates issued. It is reasonable to hold the certificate until the final invoice is paid, but tell the customer this before you start, in writing, so it does not feel like a surprise.

Do electricians charge VAT?

You must register for VAT if your taxable turnover goes over £90,000 in any rolling 12-month period (the threshold since 1 April 2024). Below that, registration is optional, and you must not show VAT or a VAT number on your invoices if you are not registered. Once registered, most electrical work is standard-rated at 20%.

Some energy-saving installations in homes are treated differently. Solar panels and some battery storage installed in residential property have qualified for a VAT relief under HMRC’s energy-saving materials rules, while most other electrical work, including EV chargers, has not. The rules and dates have changed several times, so check HMRC’s VAT Notice 708/6 or ask your accountant before you invoice at anything other than 20%.

If you are VAT-registered and work as a subcontractor for a VAT-registered contractor under CIS, the domestic reverse charge usually applies: your invoice shows the VAT rate and amount, but states that the customer must account for the VAT to HMRC instead of paying it to you. It does not apply when you invoice a homeowner, a landlord for their own property or another end user.

CIS for electricians working as subcontractors

Electrical installation counts as construction work under the Construction Industry Scheme. If you do work for a builder, developer or main contractor, they must deduct CIS from your payments: 20% if you are registered with HMRC as a subcontractor, 30% if you are not, or nothing if you hold gross payment status. CIS does not apply to work you do directly for a homeowner.

Deductions come off the labour part of the invoice, not materials you bought for the job. That makes it important to split labour and materials clearly on every invoice you send to a contractor. If your invoice is one lump sum, the contractor may deduct from the whole amount. Keep the monthly payment and deduction statements your contractor gives you — the deductions count towards your tax and National Insurance bill at the end of the year.

Invoicing landlords and letting agents for EICRs

Landlords in England must have the electrical installation in a privately rented property inspected and tested at least every five years and give a copy of the report to tenants. If the EICR finds C1, C2 or FI items, the landlord generally has 28 days (or less if the report says so) to get remedial work done. Wales and Scotland have their own rules, so check which apply to the property.

That gives you a natural two-invoice pattern: one invoice for the inspection itself, and a separate estimate for remedials, converted to an invoice when the landlord approves it. Keeping them separate stops the landlord disputing the inspection fee because they disagree with the remedial quote. Put the property address, the EICR number and the agent’s purchase order or job reference (if they use one) on both.

Letting agents often pay on 14 or 30 day terms and may need the invoice addressed to the landlord “care of” the agency. Ask before you send, so it goes to the right place first time.

Common electrician invoicing mistakes

  • Lumping fault-finding time into one unexplained “labour” figure, which invites a dispute.
  • Forgetting the certificate number, then having to dig it out when the customer sells the house.
  • Not separating labour and materials on contractor invoices, so CIS is deducted from the full amount.
  • Charging VAT before you are registered, or forgetting to start charging it once you pass £90,000.
  • Invoicing an EICR and the remedial work on one bill before the landlord has agreed the remedials.
  • Leaving invoices until the weekend, by which time small extras (an extra socket, a replaced fitting) are forgotten.
  • No written payment terms, so “I’ll pay you next week” becomes next month.

Getting paid and Making Tax Digital

For domestic jobs, ask for payment on completion or within 7 days and say so on the estimate as well as the invoice. For business customers — contractors, letting agents, commercial clients — the Late Payment of Commercial Debts (Interest) Act lets you claim statutory interest at 8% above the Bank of England base rate on overdue invoices, plus fixed compensation of £40, £70 or £100 depending on the invoice size. That law does not apply to homeowners and other consumers; for them, you can only charge late-payment interest if it was clearly agreed in your terms before the work started.

Making Tax Digital for Income Tax has applied since 6 April 2026 to sole traders and landlords with qualifying income over £50,000, and is due to extend to those over £30,000 from April 2027 and over £20,000 from April 2028. If it applies to you, you will need compatible software to keep digital records and send quarterly updates to HMRC. AllSquare does not file with HMRC, but keeping every invoice numbered and itemised in one place makes those updates much easier. Check gov.uk for the current rules for your income.

Questions from electricians

Real questions from sparkies running their own books.

Tap the mic, describe the job — “Two hours on a fault-find, two RCBOs at £18 each, callout fee” — and AllSquare drafts a complete invoice with line items, quantities and totals. You review it on screen, edit anything that’s off, and send the PDF.

Simple, transparent pricing

Start free, upgrade when you need. No hidden fees, cancel anytime.

Free

Everything you need to get started

£0

Free forever

  • Invoices2 per month
  • Estimates2 per month
  • AI Credits10 / month
  • ClientsUnlimited
  • Price List
  • PDF Export
  • Cloud Sync
  • Custom Branding
Download for Free
Most Popular

AllSquare Pro

Full access, cancel anytime

£5.99/month

Unlimited invoices, estimates & AI

  • InvoicesUnlimited
  • EstimatesUnlimited
  • AI Credits100 / month
  • ClientsUnlimited
  • Price List
  • PDF Export
  • Cloud Sync
  • Custom Branding
  • Priority Support
Start Free Trial

Spark up your invoicing

UK electricians use AllSquare to invoice on-site, track payments, and stop chasing paperwork at weekends.